Manhattan / Kitchen

Kitchen Remodeling in Manhattan, NY

Fully custom Manhattan kitchens planned around cabinetry, materials, building requirements, and the realities of pre-war dimensions and high ceilings.

Company planning guidance

A luxury kitchen remodel is planned in stages.

These are company planning guidelines, not universal timelines.

01

Design & approvals

2–4 months

02

Procurement

1–3 months

03

Construction

8–12 weeks

04

Total

A luxury Manhattan kitchen remodel typically takes 6–10 months.

Materials / cabinetry

Built for the room you actually have.

Fully custom cabinetry

Cabinetry can use solid maple, oak, or walnut; soft-close hardware; floor-to-ceiling construction; counter-depth appliances; and concealed paneled appliances for a luxury open-plan kitchen. It is built to fit irregular pre-war dimensions and high ceilings.

Countertops

Calacatta and Statuario marble are timeless and need regular sealing. Quartzite such as Sea Pearl offers a marble look with scratch and heat resistance. Engineered quartz such as Caesarstone, Cambria, or Silestone is low maintenance.

Manhattan delivery requires precise templating, narrow hallways, tight elevators, and building access hours to be part of the plan.

Building coordination

The building is part of the kitchen plan.

Plan for COIs, alteration agreement requirements, service elevator scheduling, material deliveries, common-area protection, and board submission materials.

We help coordinate filings through licensed professionals when required.

Final approvals are determined by the building, board, or applicable agency.

ILLUSTRATIVE EXAMPLES

AI-generated illustration of a material board and renovation blueprintsAI-generated illustration. Not a completed Corniel project.
AI-generated illustration. Not a completed Corniel project.

COMPLETED CORNIEL PROJECTS

Pre-renovation condition assessment during a verified construction process
Verified Corniel Work — process documentationPre-renovation condition assessment.

Neighborhood specificity

Layouts around the work triangle.

Kitchen layouts are designed around the work triangle in SoHo and Greenwich Village.

The process

Planning through cleanup.

01

Planning & Design

Plan the layout, materials, approvals, and building logistics.

02

Cost Estimate & Approval

Review the cost estimate and approval requirements before construction.

03

Demolition & Construction

Coordinate demolition, construction, trades, deliveries, and building access.

04

Finishing Touches & Cleanup

Complete the finish work, protect common areas, and clean up.

Kitchen FAQ

Useful answers before the first meeting.

How do I select a countertop?

Choose between Calacatta or Statuario marble, quartzite such as Sea Pearl, and engineered quartz such as Caesarstone, Cambria, or Silestone based on the desired look, sealing needs, and maintenance requirements.

What about the backsplash?

Coordinate backsplash selection with the countertop and precise templating, while accounting for narrow hallways, tight elevators, and building access hours.

How long does a luxury Manhattan kitchen remodel take?

Company planning guidance is 2–4 months for design and approvals, 1–3 months for procurement, and 8–12 weeks for construction. A total luxury Manhattan kitchen remodel typically takes 6–10 months.

What mistakes should I avoid?

Avoid planning without a budget, ignoring permits, and rushing construction.

Manhattan kitchen consultation

Plan the kitchen with the building in view.

Start with the layout, the building requirements, and the approvals.