Documented restroom areas
- Room 222 Women: three stalls
- Room 319 Men: two stalls and one urinal
- Room 200
The number of restrooms is not generalized beyond these verified room details.
Institutional project record / Washington Heights
Restroom renovation at Esperanza Center, a non-profit agency in Washington Heights, in 2024 while the agency remained in operation. This page documents the supplied rooms, finishes and coordination facts.
The number of restrooms is not generalized beyond these verified room details.
Corniel prepared dimensioned layouts in May 2024. Mavi New York charcoal partitions went through two rounds of shop drawings; urinal screens were included and installation took place in July 2024. Other documented finishes include wood-look vinyl flooring, painted block walls and a stainless-steel hand dryer.


Google five-star review, April 2025.
“Corniel Construction LLC did an amazing job renovating our agency bathroom! Waldy was a fantastic contractor - professional, reliable, and flexible. He worked seamlessly around our demanding schedule, ensuring minimal disruption to our operations. The finished product looks fantastic and exceeded our expectations. Highly recommend Corniel Construction and Waldy's expertise for your renovation needs!”
Elizabeth Chavez. View the source review ↗
Send the address, the scope and your drawings or photos. Waldy Corniel reviews every inquiry personally.
We respond within 1 business day.